§ Project · Aventura

Aventura Hospital Cooling Tower

Structural enhancement of the cooling tower support system at an operational hospital campus.

Aventura Hospital Cooling Tower, Aventura
CBG · AVENTURA
Location
Aventura
Sector
Healthcare institutional
Scope
Structural enhancements to cooling-tower support
Status
Delivered
§ Challenge

Cooling towers at a hospital cannot go offline — patient life-safety systems depend on continuous chilled water. Every enhancement had to happen without interrupting mechanical load.

§ Approach
  1. 01Temporary shoring designed by partnering structural engineer
  2. 02Staged load transfer so active tower stayed on-line
  3. 03Vibration monitoring throughout work window
  4. 04Infection-control protocols for any work adjacent to patient corridors
Aventura Hospital Cooling Tower — secondary view
§ Outcome

Cooling capacity remained uninterrupted. Structural enhancement stamped and accepted by EOR.

Start your project

Similar scope, different building? We'll walk your site and put a fixed plan in front of you within 7 days.