
Spall repair, structural rebuilds, post-tension remediation.
CORE Builder Group is the structural restoration firm entrusted with Brickell City Centre, Ft. Lauderdale International Airport, Aventura Hospital, and hundreds of condominium recertifications across Miami-Dade. Post-tension, concrete, waterproofing, 40-year recert — engineered in-house.
Self-performed across the critical path — concrete, post-tensioning, envelope, recertification, historic restoration, carbon fiber, barrier cables, and amenity rebuilds. No subcontractor handoffs on structural work.
All services
Load-bearing concrete, brought back to original design strength.

Failed and corroded PT tendons in decks, slabs, parking structures.

Engineered for salt, humidity, hurricane sun, sub-tropical rain.

Full restoration scope for all Florida milestone and recertification thresholds.

Full structural and architectural restoration of landmark buildings.

Coating removal, concrete repair, finish rebuild for high-use decks.

Installation, repair, and recertification of tensioned barrier cable systems.

Emergency structural repairs. Red tags, unsafe-structure notices, code violations.

CFRP structural strengthening — added capacity without demolition.
We hold South Florida

Spall repair, structural rebuilds, post-tension remediation.

Waterproofing engineered for the Atlantic — salt, humidity, sun.

40-year recertification with engineer-of-record sign-off.

We work occupied buildings. Tenants stay. Operations don't.
Landmark projects across South Florida — towers, hotels, airports, hospitals, schools. The work is the résumé. These are the files we open first.
Open the full archiveEvery condominium and commercial building turning thirty in Miami-Dade enters the recertification window — and Surfside changed how seriously the county enforces it. CORE handles the entire scope: concrete spall repair, post-tension remediation, waterproofing, balcony rebuilds, electrical sign-off. From the engineer-of-record's reinspection report to the stamped re-inspection. Typical condominium timeline: 90–180 days.
Whether it's a 40-year recert, a post-tension emergency, or an institutional rebuild — we walk the site, scope the work, and put a fixed plan in front of you within 7 days.