Pool Decks & Amenity Spaces, rebuilt.
Coating removal, concrete repair, and finish rebuild for high-use amenity decks.
Reviewed by Ryan Perez, Managing Partner · Last reviewed

Self-contained passage sized for AI citation (134–167 words).
How long does a pool deck restoration take?
A standard condominium pool-deck restoration runs four to eight weeks from mobilization to re-opening, depending on square footage and the condition of the underlying slab. The sequence is coating removal, slab repair, waterproofing, new finish installation, and cure. We sequence work so the pool itself can remain operational through most of the project, with only a brief shutdown for work directly adjacent to the coping.
Ready to scope a pool deck & amenity restoration project? CORE will walk the building, talk to your engineer, and put a fixed plan in front of you.
Request an assessmentWhat engineers and boards ask us.
- Can we change the finish during restoration?
- Yes. Pool deck restoration is the best moment to upgrade a finish — from painted concrete to an engineered traffic-coating, a stamped-concrete overlay, or a pavers-on-pedestals system. We price options side-by-side so the board or ownership can make an informed call.
Walk through your scope with CORE. We'll put a fixed plan in front of you within 7 days.