Parker Dorado — 40-Year Recert. & Hallway Beautification
Full 40-year recertification scope plus hallway and parking garage beautification for a Surfside condominium association.

- Location
- Surfside
- Sector
- Condominium / HOA
- Scope
- 40-year recertification · interior beautification
- Status
- Delivered
A multi-phase 40-year recertification combined with resident-facing beautification meant two very different worlds of work had to share the same building — with residents in place.
- Communications plan: weekly resident updates and posted schedules
- Concrete spall repair, waterproofing, and balcony rebuilds
- Parking garage re-striping, concrete repair, and lighting refresh
- Hallway finishes coordinated to present a single unified reveal
Building recertified on time. Board-led resident survey returned high satisfaction across the phased project.
Similar scope, different building? CORE will walk your site and put a fixed plan in front of you within 7 days.
The CORE scopes behind this project.
Building Recertification (25 Year, 30 Year, 40 Year, 50 Year, 60 Year, etc.)→
How CORE Builder Group delivers the structural restoration scope on a Miami-Dade or Broward 40-year recertification — sequenced for occupancy, priced with full transparency, stamped by your engineer of record.
Structural & Concrete Restoration→
Rebuilding load-bearing concrete, columns, slabs, and beams to original design strength — without displacing the people inside your building.
Waterproofing Systems→
Building envelope, below-grade, and plaza-deck waterproofing systems designed for wind-driven rain, salt air, and sub-tropical humidity.
