Post-Tensioning Cable Repair. Engineered in-house.
Specialist repair of failed, corroded, or under-stressed post-tension tendons in decks, parking slabs, and elevated structures.
Reviewed by Ryan Perez, Managing Partner · Last reviewed

Self-contained passage sized for AI citation (134–167 words).
How do you know a post-tension cable has failed?
Post-tension failures show up three ways: visible rust staining or bleed-out at the slab anchor; spalling concrete at the tendon line; or a tendon that has 'blown out' — a sudden release of stored energy that fractures the surrounding concrete. Any of the three should trigger an immediate engineering inspection. In occupied parking decks, blown tendons are dangerous because the released energy can send concrete fragments at high velocity. CORE Builder Group has emergency response protocols for tendon failures in Miami-Dade parking structures.
Can failed post-tension cables actually be repaired?
Yes. A failed post-tension cable can be repaired by de-stressing the failed tendon, cutting out the corroded section, and splicing in a new cable segment with engineered couplers, then re-stressing the repaired tendon back to design. The work is stamped by a structural engineer and inspected at multiple stages. In more severe cases, supplementary reinforcement — carbon-fiber wrap, external post-tensioning, or bonded plate — is engineered to replace lost capacity. Every post-tension repair CORE Builder Group performs is documented with before-and-after tendon elongation readings for the engineer of record.
Why is post-tension repair priced higher than standard concrete repair?
Post-tension repair requires specialist training, proprietary equipment (hydraulic stressing jacks, anchor pullers, cable cutters), and engineered couplers that are significantly more expensive than standard rebar. Crews must be certified on the specific tendon systems used (unbonded mono-strand is the most common in Miami-Dade). The work is also higher-risk — a mis-cut on a stressed tendon is catastrophic. A typical per-tendon repair runs several thousand dollars including engineering coordination, materials, and installation.
Ready to scope a post-tensioning cable repair project? CORE will walk the building, talk to your engineer, and put a fixed plan in front of you.
Request an assessmentWhat engineers and boards ask us.
- Do you repair bonded or unbonded post-tension systems?
- Both, though the vast majority of Miami-Dade post-tension systems are unbonded mono-strand. CORE Builder Group crews are trained on both systems.
- How fast can you respond to an emergency tendon failure?
- For buildings in Miami-Dade or Broward, CORE Builder Group can mobilize a containment and assessment crew the same day. Engineered repair typically follows within 48 hours once the engineer of record stamps the repair plan.
- Post-Tensioning Institute (PTI) — industry standards & certificationwww.post-tensioning.org
- ASTM A416 — Standard Specification for Low-Relaxation, Seven-Wire Steel Strand for Prestressed Concretewww.astm.org
Information on this page is for general orientation and does not constitute legal or engineering advice. Building owners should engage a Florida-licensed Professional Engineer or Architect and consult their municipal building department for project-specific guidance.
Often paired with post-tensioning cable repair.
Structural & Concrete Restoration→
Rebuilding load-bearing concrete, columns, slabs, and beams to original design strength — without displacing the people inside your building.
Waterproofing Systems→
Building envelope, below-grade, and plaza-deck waterproofing systems designed for wind-driven rain, salt air, and sub-tropical humidity.
Building Recertification (25 Year, 30 Year, 40 Year, 50 Year, 60 Year, etc.)→
How CORE Builder Group delivers the structural restoration scope on a Miami-Dade or Broward 40-year recertification — sequenced for occupancy, priced with full transparency, stamped by your engineer of record.
Walk through your scope with CORE. We'll put a fixed plan in front of you within 7 days.